Custom Stainless Steel Precision CNC Turning Components

Still deciding? Get samples of $ !
Request Sample

Product Description

🔹 Basic Info.
Model NO.
CNC030307
Surface Treatment
Customized
Production Type
Mass Production
Machining Method
CNC Machining
Material
Steel, Alloy, Copper, Aluminum, Iron
Service
OEM\ODM\Customized
Certificate
ISO9001:2008
MOQ
1000PCS
Weight
10g-200kg
Transport Package
Wooden Boxes Package
Production Capacity
500000 PCS/Year
⚙️ CNC Machining & Production
Process Machining, CNC Turning, CNC Milling
Material Carbon steel: 1020, 1035, 1045, 1055, Q235, Q345; Alloy steel: 40Cr, 20CrMnTi, 20CrNiMo, 42CrMo4; Stainless steel: SS304, SS316 etc.
Standard ISO, DIN, ASTM, BS etc.
Machining Tolerance 0.02mm - 0.1mm
Surface Treatment Shot/sand blast, polishing, Surface passivation, Powder coating, E-Coating, Chromate Plating, zinc-plate, Painting.
Quality Control 1. Raw materials chemical & size test
2. Random inspection during production
3. Final size test with coordinate instruments
4. Strength and hardness mechanical property test
5. Assembly and function test

Custom Manufacturing: All parts are custom made according to customer's drawings or samples. Technical drawings including material mark, product weight, and purchase quantity help us provide accurate and reasonable pricing quickly.

❓ Frequently Asked Questions
How long does it take to receive samples?
Pattern creation takes 30-45 days after order. Samples are typically ready 30 days after the pattern is finished. Note that lead times refer to production and do not include transportation.
What is the new product development process?
After receiving the tooling and sample order with a 50% deposit, we hold a departmental meeting to set the schedule. We then design and manufacture molds, fixtures, and gauges in-house, followed by machining, inspection, and sending the sample with an initial report.
How long is the manufacturing lead time for mass production?
Mass production typically takes 90 days after sample approval. This includes general production and transportation time. Special arrangements can be made for urgent customer needs.
How do you manage quality control?
We perform APQP at early stages, implement strict product and process requirements, and conduct patrol inspections. Final audits and inspections are performed before goods are packed and dispatched.
What are the standard payment terms?
We generally request 50% of the tooling fee in advance, with the balance due upon sample acceptance. For production, we prefer a 50% deposit and the balance via T/T before shipping. Terms are negotiable for long-term partners.
How long does shipping take from China?
By sea, it takes about 5-6 weeks to European ports and 2-3 weeks to US ports. By air, delivery to most major international destinations takes approximately 7 days.

Related Products